Lessons Learned749

Operator Rig Discipline / Origin Project Phase Well Section Date What Happened
DNO 5866 – DNO Deepsea Yantai Drilling
Own Experience
Planning 25/7-11 S
Norma
Surface section 30/07/2023 Difficulties with logistics to separate the joints below 11.5 m and the joints longer due to limited . . .
Drilling Engineer / Morten Laget
PDF Edit
DNO 5860 – DNO Deepsea Yantai Drilling
Own Experience
Planning 25/7-11 S
Norma
Top hole 30/07/2023 One of the stop collars fell of when it was picked up from the boat. When laying down the . . .
Drilling Engineer / Morten Laget
PDF Edit
Wellesley 5840 – Wellesley Deepsea Yantai Drilling Planning 35/10-10S
Carmen
Intermediate section 20/06/2023 It was run according to tally.
Drilling Engineer / Morten Laget
PDF Edit
Wellesley 5837 – Wellesley Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Surface section 16/06/2023 Pups could not be run from aux using the “handshake” technique (too short for the Hydraracker) and . . .
Drilling Engineer / Morten Laget
PDF Edit
Wellesley 5836 – Wellesley Deepsea Yantai Drilling
Own Experience
Planning 35/10-10S
Carmen
Top hole 16/06/2023 The casing string run was a mixed string of VAM TOP and VAM 21 with VAP TOP run first. This meant . . .
Drilling Engineer / Morten Laget
PDF Edit
Wellesley 5835 – Wellesley Deepsea Yantai Drilling
Own Experience
Planning 35/10-10S
Carmen
Surface section 16/06/2023 Crossovers supplied were of very different lengths: 4m, 6m and 12m.
Drilling Engineer / Morten Laget
PDF Edit
Wellesley 5157 – Wellesley Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Production section 24/04/2023 It was done before the cementer got the change to da a pre-job check / install bypass baffle etc.
Drilling Engineer / Morten Laget
PDF Edit
Wellesley 5140 – Wellesley Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Surface section 13/04/2023 NPT: 0.75 hrs Cost: 156 250 NOK Observed poor make-up of jt #204 into jt #111: – No shoulder . . .
Drilling Engineer / Morten Laget
PDF Edit
Wellesley 5139 – Wellesley Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Surface section 13/04/2023 NPT: 1.25 hrs Cost: 260 417 NOK Performed mechanical repair on make/break cylinder on casing . . .
Drilling Engineer / Morten Laget
PDF Edit
Wellesley 5131 – Wellesley No Rig Drilling Operational No well Surface section 10/04/2023 Difficulties passing 20″ CSG shoe through FMS. Engaged CRTi and pushed through.
Drilling Engineer / Morten Laget
PDF Edit
Wellesley 5122 – Wellesley Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Surface section 09/04/2023 The shoetrack was made up to 27,500 ft.lbs.
Drilling Engineer / Morten Laget
PDF Edit
Wellesley 5121 – Wellesley Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Surface section 09/04/2023 Did not observe a shoulder making the casing up to 27 500 ft-lbs.
Drilling Engineer / Morten Laget
PDF Edit
Wellesley 5115 – Wellesley Deepsea Yantai Drilling Operational Eirik (OMV) Production section 30/03/2023 If we are leaning to one of the sides it is easy to hang up in something which can result in a . . .
Sander Schaathun / Morten Laget
PDF Edit
PGNiG 4841 – PGNiG Deepsea Yantai Drilling
Own Experience
Operational 6608/1-1 S Intermediate section 04/09/2022 Had to switch to a BX elevator
Drilling Engineer / Morten Laget
PDF Edit
Wellesley 2325 – Wellesley Borgland Dolphin Drilling
Own Experience
Operational 36/1-4
Hemispheres
Top hole 24/12/2021 The deck-crew on days started to lay out slick joints in one bay before a crew change happened in . . .
Drilling Engineer / Morten Laget
PDF Edit
Wellesley 2321 – Wellesley Borgland Dolphin Drilling
Own Experience
Operational 36/1-4
Hemispheres
Top hole 23/12/2021 o At 281m conductor couldn’t pass due to the tight spot observed when drilling there. Attempted to . . .
Drilling Engineer / Morten Laget
PDF Edit
INEOS 2320 – INEOS Borgland Dolphin Drilling
Own Experience
Operational 6306/3-1 S
Fat Canyon
Production section 09/12/2021 Managed to barely land the casing in very sticky clay. Since the mainbore 9 5/8″ casing became . . .
Steinar Aarnes / Morten Laget
PDF Edit
INEOS 2318 – INEOS Borgland Dolphin Drilling
Own Experience
Operational 6306/3-1 S
Fat Canyon
Production section 09/12/2021 The used 9 5/8″ casing was run quite smoothly. Not a single joint rejected, and Frank’s tongs . . .
Steinar Aarnes / Morten Laget
PDF Edit
INEOS 2302 – INEOS Borgland Dolphin Drilling
Own Experience
Operational 6306/3-1 S
Fat Canyon
Production section 10/11/2021 Went down with 9 5/8″ cutters and cut the casing, observed 75 bar pressure drop and torque drop to . . .
Drilling Engineer / Morten Laget
PDF Edit
INEOS 2214 – INEOS Borgland Dolphin Drilling
Own Experience
Operational 6306/3-1 S
Fat Canyon
Top hole 10/10/2021 It happened as planned. However, a suggestion of improvement was proposed.
Drilling Engineer / Morten Laget