| Operator | Rig | Discipline / Origin | Project Phase | Well | Section | Date | What Happened | |
|---|---|---|---|---|---|---|---|---|
Wellesley
5128 – Wellesley
|
Deepsea Yantai | Logistics | Operational | 35/10-10S Carmen |
Surface section | 10/04/2023 |
Logistical problems when Shoe track joints are placed on top of all other CSG on the boat. Shoetrack . . . Drilling Engineer / Morten Laget |
PDF Edit |
Wellesley
4960 – Wellesley
|
Borgland Dolphin | Logistics Own Experience |
End of Well | 36/1-4 Hemispheres |
Other | 14/12/2022 |
Sevaral months after end of operation personnel on Saga Fjordbase found a full mudskip left after . . . Johan Kjos-Hanssen / Morten Laget |
PDF Edit |
INEOS
4952 – INEOS
|
No Rig | Logistics NEA Q&A |
Planning | No well | Surface section | 07/11/2022 |
test- Kan du slette denne Daniel? Karina Helle / Tommy Johnsen |
PDF Edit |
PGNiG
4923 – PGNiG
|
Deepsea Yantai | Logistics Own Experience |
Planning | 6608/1-1 S Copernicus |
Other | 03/10/2022 |
With this focus the mobilization plan became a live document and with a weekly focus, ensuring all . . . Johan Kjos-Hanssen / Morten Laget |
PDF Edit |
PGNiG
4921 – PGNiG
|
Deepsea Yantai | Logistics Own Experience |
Operational | 6608/1-1 S Copernicus |
Other | 20/09/2022 |
Due to late busy vessel schedule of PSV and MI Swaco vessel MS Norbar, mud for 8-1/2″ Section was . . . Johan Kjos-Hanssen / Morten Laget |
PDF Edit |
PGNiG
4902 – PGNiG
|
Deepsea Yantai | Logistics | Operational | 6608/1-1 S Copernicus |
Top hole | 15/09/2022 |
It was sent out personell who had not been on the rig before and was not experienced with the . . . Drilling Engineer / Morten Laget |
PDF Edit |
PGNiG
4846 – PGNiG
|
Deepsea Yantai | Logistics | Operational | 6608/1-1 S Copernicus |
Reservoir section | 12/09/2022 |
The BU GVR MWD tool for 8 1/2″ section not at site when drilling the section. The near bit . . . Drilling Engineer / Morten Laget |
PDF Edit |
PGNiG
4922 – PGNiG
|
Deepsea Yantai | Logistics Own Experience |
Operational | 6608/1-1 S | N/A | 12/09/2022 |
Captain of the vessel suggested to use the Brine tank for the Premix as Premix does not contain . . . Johan Kjos-Hanssen / Morten Laget |
PDF Edit |
PGNiG
4840 – PGNiG
|
Deepsea Yantai | Logistics Own Experience |
Operational | 6608/1-1 S Copernicus |
Top hole | 04/09/2022 |
With good planning and cooperation, everything shipped to SSJ prior to operation start in due time. . . . Johan Kjos-Hanssen / Morten Laget |
PDF Edit |
Wellesley
4487 – Wellesley
|
Borgland Dolphin | Logistics Own Experience |
Planning | 36/1-4 Hemispheres |
Other | 15/01/2022 |
Another operator with the same rig chooses other vessels for a short well. Rig IDC, PSV’s not IDC . . . Johan Kjos-Hanssen / Morten Laget |
PDF Edit |
Wellesley
2347 – Wellesley
|
Borgland Dolphin | Logistics Own Experience |
Operational | 36/1-4 Hemispheres |
Top hole | 28/12/2021 |
Saga Fjordbase took the 75ft riser joint and backloaded in addition to the 30″ conductor joints. The . . . Drilling Engineer / Morten Laget |
PDF Edit |
Wellesley
2346 – Wellesley
|
Borgland Dolphin | Logistics Own Experience |
Operational | 36/1-4 Hemispheres |
WELS/Kabal software | 27/12/2021 |
Dolphin HR-personnel booked and moved people in WELS, then they confirmed them in WELS also, in . . . Drilling Engineer / Morten Laget |
PDF Edit |
Wellesley
2326 – Wellesley
|
Borgland Dolphin | Logistics Own Experience |
Operational | 36/1-4 Hemispheres |
Top hole | 26/12/2021 |
The base and boat backloaded the primary and secondary 18 3/4″ WHHs instead of two 30″ conductor . . . Drilling Engineer / Morten Laget |
PDF Edit |
Wellesley
2322 – Wellesley
|
Borgland Dolphin | Logistics Own Experience |
Operational | 36/1-4 Hemispheres |
Top hole | 23/12/2021 |
It was observed in the manifest that the connection on the 13 3/8″ swages was Vam21, in addition to . . . Drilling Engineer / Morten Laget |
PDF Edit |
INEOS
2303 – INEOS
|
Borgland Dolphin | Logistics Own Experience |
Operational | 6306/3-1 S Fat Canyon |
Production section | 14/11/2021 |
The BHA was sent from Stavanger to Kristiansund, and after screening the loadout list from . . . Drilling Engineer / Morten Laget |
PDF Edit |
INEOS
2273 – INEOS
|
Borgland Dolphin | Logistics Own Experience |
Operational | 6306/3-1 S Fat Canyon |
Production section | 05/11/2021 |
During operation drilling did go slower than expected and way too often the boats has to go to the . . . Drilling Engineer / Morten Laget |
PDF Edit |
INEOS
2272 – INEOS
|
Borgland Dolphin | Logistics Own Experience |
Operational | 6306/3-1 S Fat Canyon |
Production section | 04/11/2021 |
SLB D&M sends out several 8ft containers only filled with for examples batteries. One therefore . . . Drilling Engineer / Morten Laget |
PDF Edit |
INEOS
2212 – INEOS
|
Borgland Dolphin | Logistics Own Experience |
Operational | 6306/3-1 S Fat Canyon |
Top hole | 07/10/2021 |
The container that contained swivels and HP Filterunit on the manifest was opened on the rig, but . . . Drilling Engineer / Morten Laget |
PDF Edit |
INEOS
2211 – INEOS
|
Borgland Dolphin | Logistics Own Experience |
Operational | 6306/3-1 S Fat Canyon |
Top hole | 07/10/2021 |
The PSV boat was sent without the 9 7/8″ Pilot BHA due a mistake in WELS. The loadout day of the BHA . . . Drilling Engineer / Morten Laget |
PDF Edit |
DNO
2196 – DNO
|
Borgland Dolphin | Logistics | 2/5-15 Gomez |
04/10/2021 |
Backloaded with lack of information. Sent to wrong vendor/handled wrong. The casing was mistakenly . . . Martin Vikse / Morten Laget |
PDF Edit |
NO LLs for INEOS