| Operator | Rig | Discipline / Origin | Project Phase | Well | Section | Date | What Happened | |
|---|---|---|---|---|---|---|---|---|
INEOS
4952 – INEOS
|
No Rig | Logistics NEA Q&A |
Planning | No well | Surface section | 07/11/2022 |
test- Kan du slette denne Daniel? Karina Helle / Tommy Johnsen |
PDF Edit |
INEOS
2320 – INEOS
|
Borgland Dolphin | Drilling Own Experience |
Operational | 6306/3-1 S Fat Canyon |
Production section | 09/12/2021 |
Managed to barely land the casing in very sticky clay.
Since the mainbore 9 5/8″ casing became . . . Steinar Aarnes / Morten Laget |
PDF Edit |
INEOS
2319 – INEOS
|
Borgland Dolphin | Drilling Own Experience |
Planning | 6306/3-1 S Fat Canyon |
Top hole | 09/12/2021 |
Encountered several shallow gas zones. The decision to use and mobilize foam cement took some . . . Steinar Aarnes / Morten Laget |
PDF Edit |
INEOS
2318 – INEOS
|
Borgland Dolphin | Drilling Own Experience |
Operational | 6306/3-1 S Fat Canyon |
Production section | 09/12/2021 |
The used 9 5/8″ casing was run quite smoothly. Not a single joint rejected, and Frank’s tongs . . . Steinar Aarnes / Morten Laget |
PDF Edit |
INEOS
2317 – INEOS
|
Borgland Dolphin | Drilling Own Experience |
Operational | 6306/3-1 S Fat Canyon |
Production section | 09/12/2021 |
Extremely slow progress ranging from 1-10m/hr.
Likely due to sweeling/stickyness of clay due to use . . . Steinar Aarnes / Morten Laget |
PDF Edit |
INEOS
2316 – INEOS
|
Borgland Dolphin | Drilling Own Experience |
Operational | 6306/3-1 S Fat Canyon |
Production section | 09/12/2021 |
Extremeley slow drilling. At worst it was down to 1-2m/hr. At best it was 9-12m/hr. Steinar Aarnes / Morten Laget |
PDF Edit |
INEOS
2303 – INEOS
|
Borgland Dolphin | Logistics Own Experience |
Operational | 6306/3-1 S Fat Canyon |
Production section | 14/11/2021 |
The BHA was sent from Stavanger to Kristiansund, and after screening the loadout list from . . . Drilling Engineer / Morten Laget |
PDF Edit |
INEOS
2302 – INEOS
|
Borgland Dolphin | Drilling Own Experience |
Operational | 6306/3-1 S Fat Canyon |
Production section | 10/11/2021 |
Went down with 9 5/8″ cutters and cut the casing, observed 75 bar pressure drop and torque drop to . . . Drilling Engineer / Morten Laget |
PDF Edit |
INEOS
2301 – INEOS
|
Borgland Dolphin | HSEQ Own Experience |
Operational | 6306/3-1 S Fat Canyon |
From start to end. | 09/11/2021 |
Øyvind Siegesmund asked if we, the drilling engineer together with supervisor, could provide a score . . . Drilling Engineer / Christina Sæland Rødne |
PDF Edit |
INEOS
2300 – INEOS
|
Borgland Dolphin | Drilling Own Experience |
Planning | 6306/3-1 S Fat Canyon |
Intermediate section | 09/11/2021 |
Initial planned centralizer program of using 1 centralizer every other joint above shoetrack to top . . . Drilling Supervisor / Morten Laget |
PDF Edit |
INEOS
2278 – INEOS
|
Borgland Dolphin | Drilling Own Experience |
Operational | 6306/3-1 S Fat Canyon |
Intermediate section | 07/11/2021 |
We had several faults on the Franks equipment. This led to troubleshooting, phone calls to town, . . . Drilling Supervisor / Morten Laget |
PDF Edit |
INEOS
2280 – INEOS
|
Borgland Dolphin | Drilling Own Experience |
Operational | 6306/3-1 S Fat Canyon |
Intermediate section | 07/11/2021 |
Had initially many problems with Franks equipment that did not work, and cold windy weather outside . . . Drilling Supervisor / Morten Laget |
PDF Edit |
INEOS
2279 – INEOS
|
Borgland Dolphin | Drilling Own Experience |
Planning | 6306/3-1 S Fat Canyon |
Intermediate section | 07/11/2021 |
9 5/8″ float shoe filled up with mud. Drilling Supervisor / Morten Laget |
PDF Edit |
INEOS
2277 – INEOS
|
Borgland Dolphin | Drilling Own Experience |
Operational | 6306/3-1 S Fat Canyon |
Intermediate section | 07/11/2021 |
It took 4,25 hrs to rig it up on Borgland Dolphin. The rigging up of casing tong and FMS slips . . . Drilling Supervisor / Morten Laget |
PDF Edit |
INEOS
2276 – INEOS
|
Borgland Dolphin | Drilling Own Experience |
Operational | 6306/3-1 S Fat Canyon |
Intermediate section | 07/11/2021 |
Decided to use the Franks casing circulating tool FA-1 Drilling Supervisor / Morten Laget |
PDF Edit |
INEOS
2275 – INEOS
|
Borgland Dolphin | Drilling Own Experience |
Operational | 6306/3-1 S Fat Canyon |
Intermediate section | 06/11/2021 |
Had two bit trips with very low, down to 1 m/hr ROP Drilling Supervisor / Morten Laget |
PDF Edit |
INEOS
2273 – INEOS
|
Borgland Dolphin | Logistics Own Experience |
Operational | 6306/3-1 S Fat Canyon |
Production section | 05/11/2021 |
During operation drilling did go slower than expected and way too often the boats has to go to the . . . Drilling Engineer / Morten Laget |
PDF Edit |
INEOS
3407 – INEOS
|
Borgland Dolphin | Drilling Own Experience |
Operational | PL937 Fat Canyon |
Intermediate section | 04/11/2021 |
ROP in 12 1/4″ section dropped to almost nothing at +/- 1900 m. Drilling parameters were varied, and . . . / |
PDF Edit |
INEOS
2272 – INEOS
|
Borgland Dolphin | Logistics Own Experience |
Operational | 6306/3-1 S Fat Canyon |
Production section | 04/11/2021 |
SLB D&M sends out several 8ft containers only filled with for examples batteries. One therefore . . . Drilling Engineer / Morten Laget |
PDF Edit |
INEOS
2269 – INEOS
|
Borgland Dolphin | Drilling Own Experience |
Operational | 6306/3-1 S Fat Canyon |
Intermediate section | 31/10/2021 |
ROP dropped from 50 m/hr to 1 m/hr Drilling Supervisor / Morten Laget |
PDF Edit |
NO LLs for INEOS