Report No. |
2280 |
Discipline/Origin |
Drilling |
Well |
Fat Canyon |
Date created |
2021/11/07 |
Project Phase |
Operational |
LL Type/Classification |
Operational |
Had initially many problems with Franks equipment that did not work, and cold windy weather outside for the operators that was outdoor running the equipment.
Run 9 5/8″ casing with FA-1 casing circulating tool where Franks is running all handling equipment, slips, elevator, casing tong, pick up elevator.
Helping each other and working together as a team will improve performance over time. Running speed increased over the day from 7 jts/hr to 13 jts/hr in a very consistent manner.
Continue work as a team and facilitate work for each other.
Worked with Franks operators, facilitated their work. Gave them food, drinks, gave them a break, had toolpusher look for small improvements, optimized small parts of the operation.
Run 9 5/8″ casing with FA-1 casing circulating tool where Franks is running all handling equipment, slips, elevator, casing tong, pick up elevator.
Helping each other and working together as a team will improve performance over time. Running speed increased over the day from 7 jts/hr to 13 jts/hr in a very consistent manner.
Continue work as a team and facilitate work for each other.
Worked with Franks operators, facilitated their work. Gave them food, drinks, gave them a break, had toolpusher look for small improvements, optimized small parts of the operation.
NO LLs for INEOS