Lessons Learned749

Operator Rig Discipline / Origin Project Phase Well Section Date What Happened
Wellesley 6059 – Wellesley No Rig No well Surface section 21/12/2023 Drilling Engineer PDF Edit
Wellesley 6060 – Wellesley Deepsea Yantai 35/10-10S
Carmen
Top hole 21/12/2023 Drilling Engineer PDF Edit
Wellesley 5937 – Wellesley Deepsea Yantai Drilling
Own Experience
INTERNAL
Operational 35/10-10S
Carmen
Other 24/10/2023 During operation several MoC’s were made. A link to the risk register was enclosed in the MoC . . .
Åse Kristin Pettersen
PDF Edit
Wellesley 5936 – Wellesley Deepsea Yantai Marine
Own Experience
Operational 35/10-10S
Carmen
CAN-Ductor 23/10/2023 Risk of WOW during Carmen CAN-Ductor installation and recovery leading to Wellesley being . . .
Stian Engvik / Morten Laget
PDF Edit
DNO 5927 – DNO Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
N/A 19/09/2023 Mud cooler was used frequently throughout the wells. It was mobilized during Eirik and rigged up . . .
John Langelandsvik / Morten Laget
PDF Edit
DNO 5923 – DNO Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Reservoir section 17/09/2023 While sampling the MDT Saturn probe got stuck. All attempts to free with wireline tension, cycling . . .
Drilling Engineer / Morten Laget
PDF Edit
DNO 5924 – DNO Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Reservoir section 17/09/2023 Side door overshot had to be run (provided by Archer with Archer-supplied procedures)
Drilling Engineer
PDF Edit
DNO 5920 – DNO Deepsea Yantai Drilling Operational 25/7-11 S
Norma
Reservoir section 11/09/2023 The cap rock was longer than anticipated, difference form mainbore. The core jammed off in the . . .
Drilling Engineer / Morten Laget
PDF Edit
DNO 5921 – DNO Deepsea Yantai Drilling Operational 25/7-11 S
Norma
Reservoir section 11/09/2023 Core jammed off on all 3 cores.
Drilling Engineer / Morten Laget
PDF Edit
DNO 5922 – DNO Deepsea Yantai Drilling Operational 25/7-11 S
Norma
Reservoir section 11/09/2023 The BHA took weight on the way down in open hole. Had to ream down on several of the core runs. On . . .
Drilling Engineer / Morten Laget
PDF Edit
DNO 5919 – DNO Deepsea Yantai Drilling Operational 25/7-11 S
Norma
N/A 10/09/2023 Done as per plan. For the coring operations a new LCM pill was mixed. The LCM from the 8 1/2″ . . .
Drilling Engineer / Morten Laget
PDF Edit
DNO 5912 – DNO Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
N/A 06/09/2023 Plugging of transfer lines when taking Microbar from vessels several times.
John Langelandsvik / Morten Laget
PDF Edit
DNO 5911 – DNO Deepsea Yantai Drilling Operational 25/7-11 S
Norma
Reservoir section 05/09/2023 Time drill to initiate KO with 2 m/hr. Good performance kicking off from mainbore, no problems
Drilling Engineer / Morten Laget
PDF Edit
DNO 5910 – DNO Deepsea Yantai Drilling Operational 25/7-11 S
Norma
Reservoir section 05/09/2023 High gas in return and losses. Believed to be due to ballooning effect. Once the well was flow . . .
Drilling Engineer / Morten Laget
PDF Edit
DNO 5908 – DNO Deepsea Yantai Operational 25/7-11 S
Norma
Reservoir section 05/09/2023 Wireline crew informed in the lesson learned meeting that it was some confusion on when to fire jar . . .
Drilling Engineer / Morten Laget
PDF Edit
DNO 5909 – DNO Deepsea Yantai Drilling Operational 25/7-11 S
Norma
P&A 05/09/2023 Due to high percentage of gas in the mud return the interface had to go over the shaker system and . . .
Drilling Engineer / Morten Laget
PDF Edit
DNO 5906 – DNO Deepsea Yantai Operational 25/7-11 S
Norma
Reservoir section 03/09/2023 The primary MDT tool and BU failed. A additional MDT tool was mobilized from Deepsea Stavanger.
Drilling Engineer / Morten Laget
PDF Edit
DNO 5907 – DNO Deepsea Yantai Drilling Operational 25/7-11 S
Norma
P&A 03/09/2023 It was not clearly stated in the HLB cement program how the cement calculations should be carried . . .
Drilling Engineer / Morten Laget
PDF Edit
DNO 5873 – DNO Deepsea Yantai Testing
Own Experience
Operational 25/7-11 S
Norma
Testing 11/08/2023 admin PDF Edit
DNO 5872 – DNO Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Surface section 07/08/2023 the ROP is very slow ( 1-2 m/hr) after drilling approximately 1500 meters using XZ816 PDC bit. . . .
Drilling Engineer / Morten Laget
PDF Edit

New Lesson Learned