| Operator | Rig | Discipline / Origin | Project Phase | Well | Section | Date | What Happened | |
|---|---|---|---|---|---|---|---|---|
Wellesley
6059 – Wellesley
|
No Rig | No well | Surface section | 21/12/2023 | Drilling Engineer | PDF Edit | ||
Wellesley
6060 – Wellesley
|
Deepsea Yantai | 35/10-10S Carmen |
Top hole | 21/12/2023 | Drilling Engineer | PDF Edit | ||
Wellesley
5937 – Wellesley
|
Deepsea Yantai | Drilling Own Experience INTERNAL |
Operational | 35/10-10S Carmen |
Other | 24/10/2023 |
During operation several MoC’s were made. A link to the risk register was enclosed in the MoC . . . Åse Kristin Pettersen |
PDF Edit |
Wellesley
5936 – Wellesley
|
Deepsea Yantai | Marine Own Experience |
Operational | 35/10-10S Carmen |
CAN-Ductor | 23/10/2023 |
Risk of WOW during Carmen CAN-Ductor installation and recovery leading to Wellesley being . . . Stian Engvik / Morten Laget |
PDF Edit |
DNO
5927 – DNO
|
Deepsea Yantai | Drilling Own Experience |
Operational | 25/7-11 S Norma |
N/A | 19/09/2023 |
Mud cooler was used frequently throughout the wells. It was mobilized during Eirik and rigged up . . . John Langelandsvik / Morten Laget |
PDF Edit |
DNO
5923 – DNO
|
Deepsea Yantai | Drilling Own Experience |
Operational | 25/7-11 S Norma |
Reservoir section | 17/09/2023 |
While sampling the MDT Saturn probe got stuck. All attempts to free with wireline tension, cycling . . . Drilling Engineer / Morten Laget |
PDF Edit |
DNO
5924 – DNO
|
Deepsea Yantai | Drilling Own Experience |
Operational | 25/7-11 S Norma |
Reservoir section | 17/09/2023 |
Side door overshot had to be run (provided by Archer with Archer-supplied procedures) Drilling Engineer |
PDF Edit |
DNO
5920 – DNO
|
Deepsea Yantai | Drilling | Operational | 25/7-11 S Norma |
Reservoir section | 11/09/2023 |
The cap rock was longer than anticipated, difference form mainbore. The core jammed off in the . . . Drilling Engineer / Morten Laget |
PDF Edit |
DNO
5921 – DNO
|
Deepsea Yantai | Drilling | Operational | 25/7-11 S Norma |
Reservoir section | 11/09/2023 |
Core jammed off on all 3 cores. Drilling Engineer / Morten Laget |
PDF Edit |
DNO
5922 – DNO
|
Deepsea Yantai | Drilling | Operational | 25/7-11 S Norma |
Reservoir section | 11/09/2023 |
The BHA took weight on the way down in open hole. Had to ream down on several of the core runs. On . . . Drilling Engineer / Morten Laget |
PDF Edit |
DNO
5919 – DNO
|
Deepsea Yantai | Drilling | Operational | 25/7-11 S Norma |
N/A | 10/09/2023 |
Done as per plan. For the coring operations a new LCM pill was mixed. The LCM from the 8 1/2″ . . . Drilling Engineer / Morten Laget |
PDF Edit |
DNO
5912 – DNO
|
Deepsea Yantai | Drilling Own Experience |
Operational | 25/7-11 S Norma |
N/A | 06/09/2023 |
Plugging of transfer lines when taking Microbar from vessels several times. John Langelandsvik / Morten Laget |
PDF Edit |
DNO
5911 – DNO
|
Deepsea Yantai | Drilling | Operational | 25/7-11 S Norma |
Reservoir section | 05/09/2023 |
Time drill to initiate KO with 2 m/hr. Good performance kicking off from mainbore, no problems Drilling Engineer / Morten Laget |
PDF Edit |
DNO
5910 – DNO
|
Deepsea Yantai | Drilling | Operational | 25/7-11 S Norma |
Reservoir section | 05/09/2023 |
High gas in return and losses. Believed to be due to ballooning effect. Once the well was flow . . . Drilling Engineer / Morten Laget |
PDF Edit |
DNO
5908 – DNO
|
Deepsea Yantai | Operational | 25/7-11 S Norma |
Reservoir section | 05/09/2023 |
Wireline crew informed in the lesson learned meeting that it was some confusion on when to fire jar . . . Drilling Engineer / Morten Laget |
PDF Edit | |
DNO
5909 – DNO
|
Deepsea Yantai | Drilling | Operational | 25/7-11 S Norma |
P&A | 05/09/2023 |
Due to high percentage of gas in the mud return the interface had to go over the shaker system and . . . Drilling Engineer / Morten Laget |
PDF Edit |
DNO
5906 – DNO
|
Deepsea Yantai | Operational | 25/7-11 S Norma |
Reservoir section | 03/09/2023 |
The primary MDT tool and BU failed. A additional MDT tool was mobilized from Deepsea Stavanger. Drilling Engineer / Morten Laget |
PDF Edit | |
DNO
5907 – DNO
|
Deepsea Yantai | Drilling | Operational | 25/7-11 S Norma |
P&A | 03/09/2023 |
It was not clearly stated in the HLB cement program how the cement calculations should be carried . . . Drilling Engineer / Morten Laget |
PDF Edit |
DNO
5873 – DNO
|
Deepsea Yantai | Testing Own Experience |
Operational | 25/7-11 S Norma |
Testing | 11/08/2023 | admin | PDF Edit |
DNO
5872 – DNO
|
Deepsea Yantai | Drilling Own Experience |
Operational | 25/7-11 S Norma |
Surface section | 07/08/2023 |
the ROP is very slow ( 1-2 m/hr) after drilling approximately 1500 meters using XZ816 PDC bit. . . . Drilling Engineer / Morten Laget |
PDF Edit |
NO LLs for INEOS