Report No. |
2302 |
Discipline/Origin |
Drilling |
Well |
Fat Canyon |
Date created |
2021/11/10 |
Project Phase |
Operational |
LL Type/Classification |
Casing |
Went down with 9 5/8″ cutters and cut the casing, observed 75 bar pressure drop and torque drop to 4-5 kNm after 2 minutes. Pressure came back up to 90 bar and continued cutting another 3 min. Pulled up with full flow and no rotation, observed 5 MT overpull. POOH and RIH with spear, pulled with 100 MT, no go. RIH run #2 with cutters, successful cut after observing rapid torque peak of 9 kNm and string vibrations (casing stump fell down on knifes) .
Planned to cut 9 5/8″ casing below seabed prior to storm coming up.
Difficult to observe when the cut has been done, and the indications of the first cut and very similar to the second one.
Planned to cut 9 5/8″ casing below seabed prior to storm coming up.
Difficult to observe when the cut has been done, and the indications of the first cut and very similar to the second one.
NO LLs for INEOS