Report No. |
4846 |
Discipline/Origin |
Logistics |
Well |
Copernicus |
Date created |
2022/09/12 |
Project Phase |
Operational |
LL Type/Classification |
Equipment |
The BU GVR MWD tool for 8 1/2″ section not at site when drilling the section. The near bit resistivity failed in the tool. Since the well was drilled past coring point and other resistivity sensors located in the BHA further apart from the bit, it was decided to continue drilling op.
To have mobilized a BU in case of tool failure.
If the GVR tool had failed at expected reservoir/coring depth, the tool would likely been pulled and operation stopped until BU tool was mobilized
To ensure to have BU tool mobilized in due time for phase of operation
To have mobilized a BU in case of tool failure.
If the GVR tool had failed at expected reservoir/coring depth, the tool would likely been pulled and operation stopped until BU tool was mobilized
To ensure to have BU tool mobilized in due time for phase of operation