Report No. |
289 |
Discipline/Origin |
Drilling |
Well |
Brasse |
Date created |
2019/10/02 |
Project Phase |
Operational |
LL Type/Classification |
Operational |
Seabed visibility poor and current high when cementing 30″ conductor. Inclination on bullseyes suggested 1 degree or less, but changed to 1.5 degrees when the 13 3/8″ was landed. This prompted a check on cement level depth via the PGB cementing funnels – which showed cement 17 m below seabed. Possibly/probably connected to heavy boulders drilled below seabed.
Cement 30″ conductor
Is there an LCM which can be added in such cases?
Investigate if there is a LCM which can be added.
Cement 30″ conductor
Is there an LCM which can be added in such cases?
Investigate if there is a LCM which can be added.
NO LLs for INEOS