Report No. |
293 |
Discipline/Origin |
Drilling |
Well |
Brasse |
Date created |
2019/10/03 |
Project Phase |
Operational |
LL Type/Classification |
Operational |
Performed cut and thread operation to free stuck wireline cable and fish wireline toolstring 1A. Used Schlumberger overshot. Had problems runnings past PBR at 796 m (hole vertical). Worked string up and down several times and reduced cable tension to 2000 lbf before RIH. Running speed up to 6 stands per hour.
Wireline cut and thread
Using liner instead of casing can cause problems when non-standard operations are necessary due to operations problems.
Evaluate in planning process.
Wireline cut and thread
Using liner instead of casing can cause problems when non-standard operations are necessary due to operations problems.
Evaluate in planning process.