The cement design was updated with reduced lead and increased tail slurry to provide better support for the conductor as it was discovered that the lead slurry does not build a lot of strength to support the conductor.
Use of lead and tail cement slurry for cementing the conductor in place.
Lead slurry does not build much strength to provide good support for the conductor.
Evaluate to use a light weight cement blend for top holes to reduce risk of losses and to ensure good suport for the conductor.
Use of lead and tail cement slurry for cementing the conductor in place.
Lead slurry does not build much strength to provide good support for the conductor.
Evaluate to use a light weight cement blend for top holes to reduce risk of losses and to ensure good suport for the conductor.