Report No. |
307 |
Discipline/Origin |
Drilling |
Well |
Canela |
Date created |
2019/01/07 |
Project Phase |
Planning |
LL Type/Classification |
Shallow Gas |
Pilot hole encountered shallow gas. Observed shallow gas flowing out of well when RIH to open up pilot hole to 26″. POOH and P&A’ed entire pilot hole section.
PWL was 20-30 m away from low probability shallow gas zones.
Avoid planning well location close to shallow gas warning.
Prepare guidelines for well placement based on 2 x seismic uncertainty.
PWL was 20-30 m away from low probability shallow gas zones.
Avoid planning well location close to shallow gas warning.
Prepare guidelines for well placement based on 2 x seismic uncertainty.
NO LLs for INEOS