When pulling the conductor there was no cement stuck to it due to use of protane wrapping on the condcutor.
The conductor was run with a protane wrapping
Good measures to use protane wrapping on the conductor. Less cement to be washed off in the moonpool POOH with the cut WH.
Continue to run the conductor with protane wrapping.
The conductor was run with a protane wrapping
Good measures to use protane wrapping on the conductor. Less cement to be washed off in the moonpool POOH with the cut WH.
Continue to run the conductor with protane wrapping.
NO LLs for INEOS