Report No. |
5133 |
Discipline/Origin |
Drilling |
Well |
Carmen |
Date created |
2023/04/10 |
Project Phase |
Operational |
LL Type/Classification |
Operational |
MWD/DD instructed drilling crew to break wrong connection when L/D 26″ BHA. As top part of assy was lifted above stick-up the catwalk securing the lifted Assy, was moved backwards, causing the inner-rod to be bent and damaged. Plan to use Back-up Assy for 17 1/2″ BHA and muster new Back-up assy from onshore.
Break off and L/D 26″ BHA
Important with clear communication from DD to Drill Crew to break correct connection.
Break off and L/D 26″ BHA
Important with clear communication from DD to Drill Crew to break correct connection.
NO LLs for INEOS