Report No. |
292 |
Discipline/Origin |
Drilling |
Well |
Brasse |
Date created |
2019/10/03 |
Project Phase |
Operational |
LL Type/Classification |
Operational |
Stuck with wireline toolstring 1A ZAIT-PEX-PPC-MSIP-PPC-NGI-XPT at 2831 m, bottom of toolstring and top of toolstring 2779 m. Pulled tension on winch up to 14000 lbf and helf for 2 hours. No tension seen on cable head, indicatinf cable stuck. Not able to pull toolstring free.
Wireline
The cable head was checked on surface after toolstring ! A was fished and pulled to surface. With 1.5 m cable left on cable head everything was fine electrically.
Suggest to split run 1A into two runs and perform pressure points on seperate WL run.
Wireline
The cable head was checked on surface after toolstring ! A was fished and pulled to surface. With 1.5 m cable left on cable head everything was fine electrically.
Suggest to split run 1A into two runs and perform pressure points on seperate WL run.