Lesson Learned


No user selected
Report No.

292

Discipline/Origin

Drilling
No origin

Well

Brasse
31/7-3 A

Date created

2019/10/03
2556 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Negative

Transocean Arctic

What happened in Reservoir section:
Stuck with wireline toolstring 1A ZAIT-PEX-PPC-MSIP-PPC-NGI-XPT at 2831 m, bottom of toolstring and top of toolstring 2779 m. Pulled tension on winch up to 14000 lbf and helf for 2 hours. No tension seen on cable head, indicatinf cable stuck. Not able to pull toolstring free.

What Was Planned

Wireline

What Was Learned

The cable head was checked on surface after toolstring ! A was fished and pulled to surface. With 1.5 m cable left on cable head everything was fine electrically.

What Actions Are Required

Suggest to split run 1A into two runs and perform pressure points on seperate WL run.

EDITOR

CLOSE LL (testing)

New Lesson Learned

You do not have permission to view this form.