DNO
5871 – DNO
|
Deepsea Yantai | Planning | 25/7-11 S Norma |
01/08/2023 |
Difficult to see with the ROV at seabed due to poor visibility and loose seabed conduction. Drilling Engineer / Morten Laget |
PDF Edit | ||
DNO
5866 – DNO
|
Deepsea Yantai | Drilling Own Experience |
Planning | 25/7-11 S Norma |
Surface section | 30/07/2023 |
Difficulties with logistics to separate the joints below 11.5 m and the joints longer due to limited . . . Drilling Engineer / Morten Laget |
PDF Edit |
DNO
5860 – DNO
|
Deepsea Yantai | Drilling Own Experience |
Planning | 25/7-11 S Norma |
Top hole | 30/07/2023 |
One of the stop collars fell of when it was picked up from the boat. When laying down the . . . Drilling Engineer / Morten Laget |
PDF Edit |
DNO
5111 – DNO
|
No Rig | Marine PSA Q&A |
Planning | No well | Other | 28/03/2023 |
Er bruk av PosmoorATA innenfor begrensingene gitt i appendiks til klassesertifikatet for Deepsea . . . Karina Helle / Morten Laget |
PDF Edit |
DNO
5097 – DNO
|
Deepsea Yantai | Multi Discipline Own Experience INTERNAL |
Planning | 25/7-11 S | Other | 22/03/2023 |
Drilling Engineers have been using online software called The Engineering ToolBox. This software . . . Stian Engvik / Morten Laget |
PDF Edit |
DNO
4761 – DNO
|
No Rig | Drilling Own Experience |
Planning | No well | N/A | 10/08/2022 |
In DG1-DG2 rig screening strategy the project landed on 1.5 or Dual derrick rig and all time and . . . Zol Mollaeian / Sigve K. Næsheim |
PDF Edit |
DNO
2209 – DNO
|
Borgland Dolphin | External Environment Own Experience |
Planning | 2/5-15 Gomez |
P&A | 06/10/2021 |
Due to potential WoW it was considered to leave the well and for DNO to join Oceaneering WH cutting . . . Christina Sæland Rødne / Christina Sæland Rødne |
PDF Edit |
DNO
2188 – DNO
|
Borgland Dolphin | Subsea Own Experience |
Planning | A-1 H, A-2 H, A-3 HT2 Oselvar |
P&A | 01/10/2021 |
As planned Lars Solvang / Stig Seland |
PDF Edit |
DNO
2172 – DNO
|
Borgland Dolphin | Subsea Own Experience |
Planning | A-1 H, A-2 H, A-3 HT2 Oselvar |
P&A | 01/10/2021 |
As planned Lars Solvang / Stig Seland |
PDF Edit |
DNO
2173 – DNO
|
Borgland Dolphin | Subsea Own Experience |
Planning | A-1 H, A-2 H, A-3 HT2 Oselvar |
P&A | 01/10/2021 |
Weight of the black eagle hose will make alignment to the manifold flushing cap difficult. Lars Solvang / Stig Seland |
PDF Edit |
DNO
2189 – DNO
|
Borgland Dolphin | Subsea Own Experience |
Planning | A-1 H, A-2 H, A-3 HT2 Oselvar |
P&A | 01/10/2021 |
Two lubricator valves installed in the landing string. Lars Solvang / Stig Seland |
PDF Edit |
DNO
2190 – DNO
|
Borgland Dolphin | Subsea Own Experience |
Planning | A-1 H, A-2 H, A-3 HT2 Oselvar |
P&A | 01/10/2021 |
As planned Lars Solvang / Stig Seland |
PDF Edit |
DNO
2111 – DNO
|
Borgland Dolphin | Completion | Planning | A-1 H, A-2 H, A-3 HT2 Oselvar |
P&A | 14/09/2021 |
Disintegrated control line clamps and loose control lines increased the required overpull to be able . . . Øystein Prytz / Stig Seland |
PDF Edit |
DNO
1531 – DNO
|
Borgland Dolphin | Logistics Own Experience |
Planning | A-1 H, A-2 H, A-3 HT2 Oselvar |
N/A | 21/05/2021 |
Max PAX during operations landed on 16 PAX in even good flying conditions and personnel was bumped . . . Johan Kjos-Hanssen / Stig Seland |
PDF Edit |
DNO
1434 – DNO
|
Borgland Dolphin | External Environment NEA Q&A |
Planning | 2/5-15 Gomez |
23/04/2021 |
Subunit C in PL006C not available in Brønnøysundregisteret. Christina Sæland Rødne / Christina Sæland Rødne |
PDF Edit | |
DNO
1433 – DNO
|
Borgland Dolphin | External Environment NEA Q&A |
Planning | 2/5-15 Gomez |
23/04/2021 |
Change in regulation §66 – contingency chemicals does not include chemicals used for lost . . . Christina Sæland Rødne / Christina Sæland Rødne |
PDF Edit | |
DNO
1432 – DNO
|
Borgland Dolphin | External Environment NEA Q&A |
Planning | 2/5-15 Gomez |
23/04/2021 |
Lack of justification why BO rates are lower in ST than MB, as the ST is 500 m deeper and length of . . . Christina Sæland Rødne / Morten Laget |
PDF Edit | |
DNO
1435 – DNO
|
Borgland Dolphin | External Environment NEA Q&A |
Planning | 2/5-15 Gomez |
23/04/2021 |
Hearing comment from Directorate of Fishery: The ERACA lacks information about fishing/fishery . . . Christina Sæland Rødne / Christina Sæland Rødne |
PDF Edit | |
DNO
1436 – DNO
|
Borgland Dolphin | External Environment NEA Q&A |
Planning | 2/5-15 Gomez |
23/04/2021 |
Hearing comment from Directorate of Fisheries: The ERACA/AfD lack information about sea mammals that . . . Christina Sæland Rødne / Christina Sæland Rødne |
PDF Edit | |
DNO
1443 – DNO
|
Borgland Dolphin | Marine PSA Q&A |
Planning | 2/5-15 Gomez |
N/A | 16/04/2021 |
Hva skal gjøres for å unngå torsjon i kjettingene både under operasjon og under bruk av . . . Karina Helle / Morten Laget |
PDF Edit |