| Operator | Rig | Discipline / Origin | Project Phase | Well | Section | Date | What Happened | |
|---|---|---|---|---|---|---|---|---|
Wellesley
258 – Wellesley
|
Transocean Arctic | Drilling | Operational | 35/4-2 Songesand |
Reservoir section | 16/06/2020 |
The mud engineer made a good displacement plan for displacing the well from SW to 1.25 sg mud. The . . . |
PDF Edit |
PGNiG
373 – PGNiG
|
Deepsea Nordkapp | Drilling | Operational | 6507/5-9 S, 6507/5-9 A Shrek |
Reservoir section | 22/10/2019 |
Odfjell changing out parts of Management (TSL, DSL, OIM) to attend 3 day leadership seminar onshore. . . . |
PDF Edit |
Wellesley
211 – Wellesley
|
Transocean Arctic | Drilling | Operational | 35/12-6 S Kallåsen |
Production section | 07/02/2019 |
The pump strokes and volume pumped (from pit sensors) matched very well from 0-83 m3 mud pumped . . . |
PDF Edit |
Wellesley
213 – Wellesley
|
Transocean Arctic | Drilling | Operational | 35/12-6 S Kallåsen |
Production section | 07/02/2019 |
Trip sheet from Geoservice and Transocean has shown different numbers. In addition, gains have been . . . |
PDF Edit |
Wellesley
214 – Wellesley
|
Transocean Arctic | Drilling | Operational | 35/12-6 S Kallåsen |
Reservoir section | 07/02/2019 |
Investigated two sensor systems in TT. |
PDF Edit |
Wellesley
201 – Wellesley
|
Transocean Arctic | Drilling | Operational | 35/12-6 S Kallåsen |
Production section | 05/02/2019 |
Tried to shear OBM mud in pits before drilling the 12 1/4″ section. At this time the well and all . . . |
PDF Edit |
Wellesley
202 – Wellesley
|
Transocean Arctic | Drilling | Operational | 35/12-6 S Kallåsen |
N/A | 05/02/2019 |
Operating with 5 deck crew, as specified in the contract, does not allow for utilizing two deck . . . |
PDF Edit |
Wellesley
203 – Wellesley
|
Transocean Arctic | Drilling | Operational | 35/12-6 S Kallåsen |
N/A | 05/02/2019 |
Column tank ST3 which was previously used for brine storage has within the last two years been . . . |
PDF Edit |
DNO
329 – DNO
|
Island Innovator | Drilling | Planning | 6507/7-16 S Canela |
P&A | 07/01/2019 |
During M/U of 20″x36″ cutting assembly (MOST tool), had to break off MOST tool above space out pup . . . |
PDF Edit |
NO LLs for INEOS