| Operator | Rig | Discipline / Origin | Project Phase | Well | Section | Date | What Happened | |
|---|---|---|---|---|---|---|---|---|
DNO
5927 – DNO
|
Deepsea Yantai | Drilling Own Experience |
Operational | 25/7-11 S Norma |
N/A | 19/09/2023 |
Mud cooler was used frequently throughout the wells. It was mobilized during Eirik and rigged up . . . John Langelandsvik / Morten Laget |
PDF Edit |
DNO
5919 – DNO
|
Deepsea Yantai | Drilling | Operational | 25/7-11 S Norma |
N/A | 10/09/2023 |
Done as per plan. For the coring operations a new LCM pill was mixed. The LCM from the 8 1/2″ . . . Drilling Engineer / Morten Laget |
PDF Edit |
DNO
5912 – DNO
|
Deepsea Yantai | Drilling Own Experience |
Operational | 25/7-11 S Norma |
N/A | 06/09/2023 |
Plugging of transfer lines when taking Microbar from vessels several times. John Langelandsvik / Morten Laget |
PDF Edit |
PGNiG
5834 – PGNiG
|
Deepsea Yantai | Drilling Own Experience |
Planning | 6305/10-1 Tomcat |
N/A | 15/06/2023 |
BO&K Analysis performed in Aug 2022, with a sensitivity on revised reservoir data.
The . . . Richard Mollison / Morten Laget |
PDF Edit |
Wellesley
5833 – Wellesley
|
Deepsea Yantai | Other | Operational | 35/10-10S Carmen |
N/A | 13/06/2023 |
Unable to lift the BOP elevator with LMRP past fixed guide/bumper beams in moonpool. LMRP diameter . . . Drilling Engineer / Morten Laget |
PDF Edit |
Wellesley
5171 – Wellesley
|
Deepsea Yantai | Operational | 35/10-10S Carmen |
N/A | 06/05/2023 |
The BOP test tool was not ready to run. No DQ onboard and no status on the tool before they left the . . . Drilling Engineer / Morten Laget |
PDF Edit | |
DEA
5072 – DEA
|
No Rig | HSEQ Own Experience INTERNAL |
No well | N/A | 17/02/2023 |
Feedback:
– Likte rebuslĂžpet veldig godt. Samme med Quiz, men kanskje ha den litt kortere. Og . . . Karina Helle / Anniken Meisler |
PDF Edit | |
PGNiG
4951 – PGNiG
|
Deepsea Yantai | Drilling | Operational | 6608/1-1 Copernicus |
N/A | 26/09/2022 |
The Electrician was called and he found a loose wire (norwegian: fase) inside one of the . . . Steinar Aarnes |
PDF Edit |
PGNiG
4922 – PGNiG
|
Deepsea Yantai | Logistics Own Experience |
Operational | 6608/1-1 S | N/A | 12/09/2022 |
Captain of the vessel suggested to use the Brine tank for the Premix as Premix does not contain . . . Johan Kjos-Hanssen / Morten Laget |
PDF Edit |
DNO
4761 – DNO
|
No Rig | Drilling Own Experience |
Planning | No well | N/A | 10/08/2022 |
In DG1-DG2 rig screening strategy the project landed on 1.5 or Dual derrick rig and all time and . . . Zol Mollaeian / Sigve K. NĂŠsheim |
PDF Edit |
Wellesley
3241 – Wellesley
|
Borgland Dolphin | HSEQ Own Experience |
Operational | 36/1-4 Hemispheres |
N/A | 28/01/2022 |
There was a dropped object (DO) incident onboard BGL, and DO is not included in the reporting & . . . Anniken Meisler / Morten Laget |
PDF Edit |
INEOS
1530 – INEOS
|
Borgland Dolphin | Drilling Own Experience |
Operational | PL937 Fat Canyon |
N/A | 02/10/2021 |
Difficulty accessing BHA drawings on SharePoint during rig move due to poor internet connection. / |
PDF Edit |
INEOS
3404 – INEOS
|
Borgland Dolphin | Rig Intake Own Experience |
Operational | PL937 Fat Canyon |
N/A | 29/09/2021 |
Continuation of key personnel offshore (DSV, DE, services companies) |
PDF Edit |
DNO
1992 – DNO
|
Borgland Dolphin | C&P Own Experience INTERNAL |
Operational | A-1 H, A-2 H, A-3 HT2 Oselvar |
N/A | 14/07/2021 |
Sometimes invoice dates does not match with actual backload dates Drilling Engineer / Stig Seland |
PDF Edit |
DNO
1547 – DNO
|
Borgland Dolphin | Drilling Own Experience |
Operational | A-1 H, A-2 H, A-3 HT2 Oselvar |
N/A | 29/05/2021 |
Camera not able to get a 360 view as it was off center Lars Solvang / Stig Seland |
PDF Edit |
DNO
1531 – DNO
|
Borgland Dolphin | Logistics Own Experience |
Planning | A-1 H, A-2 H, A-3 HT2 Oselvar |
N/A | 21/05/2021 |
Max PAX during operations landed on 16 PAX in even good flying conditions and personnel was bumped . . . Johan Kjos-Hanssen / Stig Seland |
PDF Edit |
DNO
1438 – DNO
|
Borgland Dolphin | HSEQ PSA Q&A |
Planning | 2/5-15 Gomez |
N/A | 16/04/2021 |
Hvilke tiltak har operatĂžr iverksatt for Ă„ sikre at operatĂžrs og annet 3. parts utstyr tatt ombord . . . Karina Helle / Morten Laget |
PDF Edit |
DNO
1440 – DNO
|
Borgland Dolphin | Marine PSA Q&A |
Planning | 2/5-15 Gomez |
N/A | 16/04/2021 |
Hva gjÞres for Ä unngÄ dannelse av martensitt i overflatene pÄ ankerkjettingene? Karina Helle / Morten Laget |
PDF Edit |
DNO
1439 – DNO
|
Borgland Dolphin | HSEQ PSA Q&A |
Planning | 2/5-15 Gomez |
N/A | 16/04/2021 |
Hvilke rutiner er etablert for Ă„ formidle resultater fra arbeidsmiljĂžkartlegginger eller . . . Karina Helle / Morten Laget |
PDF Edit |
DNO
1445 – DNO
|
Borgland Dolphin | HSEQ PSA Q&A |
Planning | 2/5-15 Gomez |
N/A | 16/04/2021 |
Utdrag av rapport /66/ DNO, 2021. P968-DNO-D-RA-0004 Rig intake report mhp. beredskapsrelaterte . . . Karina Helle / Morten Laget |
PDF Edit |
NO LLs for INEOS